DEI Projects |
|
|
|
|
|
|
|
| |
Dick Bivins Stadium, Amarillo, Texas
Recently Completed 2006
Contact:
DEI |
|
|
|
|
|
|
|
|
Nazarene Church, Garden City, KS
November 2004 ~ February 2005
Contact: Mid-America Millwright
Ken Green, Manager, 620-272-0775
Remodel of the church. Installation of conduit, wire, switchgear, fire alarm, and lighting systems. This was bid from a blueprint. |
|
|
|
|
|
|
|
|
|
|
|
|
|
Western Plains Medical Center, Dodge City, KS
April 2004 ~ January 2005
Contact: Robbins Morton Group Inc.
John Galassini, Sr Project Manager
615-377-3666
This project was a remodel of the emergency room at the hospital.
|
|
|
 |
|
|
|
|
|
|
|
|
|
|
US Pipeline Meter Stations, Six locations in Kansas
July 2004 ~ January 2004
Contact: US Pipeline Inc.
Lowell Brien, Project Manager
713-300-2277
This project consisted of installing all of the conduit, wire, and switchgear for six compressor stations for a pipeline running between Kansas and Wyoming. Much of this project changed as it was in progress and we were able to keep the project on schedule as changes were made sometimes daily.
|
|
|
|
|
|
|
|
|
|
|
|
|
|
St. Catherine Hospital renovation and addition
Garden City KS
January 2002 ~ April 2004
Contact: Mortenson, General Contractor
Mark Donahue, Sr Project Manager
763-287-5378
On the project we installed all the conduit, wiring, switchgear, fire alarm system, and lighting. This was a fixed price contract in which we supplied an estimate before construction. However due to our expertise we were able to value engineer certain aspects of this project and were able to establish cost savings to the owner.
|
|
|
|
|
|
|
|
|
|
Northern Natural Gas, Bushton KS
April 2003 ~September 2003
Contact: Danny Russell, NNG, Omaha NE,
402-398-7196
The
project completed was the total rewiring of a building after an explosion. Beside the wiring of the building, we installed the fire and gas detection system, lighting and all electrical systems in a Class I location. Subcontract labor was utilized on this project. In addition to this project, we have completed several fiber optic backbone installations at various Northern Natural Gas sites. The installations all included running the fiber optic backbone installations at various Northern Natural Gas sites. The installations all included running the fiber optic cable, terminating it, and testing it with our own single-mode and multi-mode testing equipment.
|
|
|
|
|
|
|
|
|
|
Tyson Fresh Meats Inc, Finny Co Plant
Presently Ongoing
Contact: Jack Sizemore 620-227-2614
DEI regularly has a crew at the plant weekdays and weekends with ongoing maintenance and construction projects.
|
|
|
|
|
|
|
|
|
|
Comanche Intermediate Center, USD 443, Dodge City, KS
January 2002 ~ July 2002
Contact: Robert Hindman, Technology Manager
620-227-1775
DEI Installed a CAT 6 structured cable system with the multi-mode fiber backbone for data and a CAT 3 cable for voice. This project was bid according to specifications, however we valued engineered the project saving the school district $19,000.00. This project was completed on time. No subcontract labor was utilized.
|
|
|
|
|
|
|
|
|
| |
|
|
|
| |
|
|
|
|